In many homes, shops, or commercial buildings, electricity poles, service lines (wires), or meters are sometimes installed in inconvenient locations. These may block entrances, create safety issues, or interfere with construction work.
If you want to shift an electricity meter, move a pole (kamba), or change the service line route, Pakistani electricity distribution companies (DISCOs) like FESCO, LESCO, GEPCO, MEPCO, IESCO, etc., provide an official and legal procedure. This article explains the complete step-by-step process. Check your FESCO electricity bill online for free by visiting our website https://fescoobil.pk/.

When Can You Apply for Meter or Pole Shifting?
You can request shifting in the following cases:
Electricity pole is blocking your gate, street, or pathway
Service wire is too low or unsafe
Meter needs to be shifted from one wall or room to another
Construction or renovation requires line relocation
Old pole needs to be removed and a new pole installed elsewhere
Electricity Meter, Pole, or Service Line Shifting Procedure
If you want more information about the FESCO Helpline, you can refer to our dedicated Helpline section.
Step 1: Submit an Application
Visit your nearest Electricity Sub-Division Office (SDO Office) and submit a written application.
Your application should include:
Consumer Number
Meter Number
Complete address
Type of request (meter shifting / pole shifting / service line change)
Desired new location
Step 2: Required Documents
Attach the following documents with your application:
Copy of latest electricity bill
Copy of CNIC
Ownership proof or owner’s permission (if tenant)
Step 3: Site Inspection
After submission:
A Junior Engineer (JE) or Line Superintendent visits your site
They check feasibility and safety requirements
A cost estimate (Demand Notice) is prepared
Step 4: Payment of Charges
Once approved:
You will receive a Demand Notice
Charges may include:
Pole cost
Service wire cost
Labor charges
Transportation charges
⚠️ Important:
Meter or pole shifting is not free. All costs are paid by the consumer.
Step 5: Shifting Work Completion
After payment:
The electricity department schedules the work
Official staff shifts the meter, pole, or service line safely
Power supply is restored after completion
How Much Time Does It Take?
Usually:
7 to 15 working days
Time may vary depending on area, workload, and nature of work
Important Safety & Legal Guidelines
Never move meters or wires yourself
Unauthorized shifting is illegal
Illegal actions may result in:
Heavy fines
Disconnection
FIR or legal action
Always follow the official procedure.
Conclusion
If you want to shift an electricity meter, pole (kamba), or service line in Pakistan, you must follow the proper process through your local electricity office.
Submitting an application, completing inspection, paying charges, and allowing official staff to do the work ensures safety, legality, and uninterrupted power supply.
Frequently Asked Questions (FAQs)
1. Can I shift my electricity meter myself?
No. Self-shifting is illegal and may result in fines or disconnection.
2. Is meter or pole shifting free?
No. All expenses are paid by the consumer as per the demand notice.
3. How long does the shifting process take?
Usually between 7 to 15 days, depending on the situation.
4. Can a tenant apply for meter shifting?
Yes, but written permission from the property owner is required.
5. Does this procedure apply to all DISCOs?
Yes. The procedure is almost the same for FESCO, LESCO, GEPCO, MEPCO, IESCO, and other DISCOs.